Skip to content
Menlo·Labs

1140 Doyle Street, Suite 4

Menlo Park, California 94025

Mon–Thu, 09:00–18:00 PT

← Index of work

02Public infrastructure2025

Tidewater

for Marin Bay Authority

The Authority had eleven years of hydrodynamic modeling that nobody outside the agency could read. We turned it into a public map that a homeowner, a planner and a reporter each get something different out of, without any of them needing a GIS license.

Plate 02 — generated diagram, tidewater telemetry

74,300
Sessions, first quarter
410 kB
Initial payload
AA+
Contrast, all map states

01

The constraint that shaped everything

The Authority asked for a map that works during a flood. That means degraded cell service, a phone at nineteen percent battery, and a user who is frightened. Every subsequent decision fell out of that sentence.

Tiles are pre-baked and cached aggressively. The application shell is a single 410 kilobyte payload with no runtime font fetch. Once a parcel has been viewed, it is available offline indefinitely.

02

Three readers, one map

A homeowner wants one number: does water reach my address, and in what year. A planner wants the scenario matrix. A reporter wants a defensible citation. Rather than three products, Tidewater has one map with three depths of disclosure, and the deeper layers are genuinely optional.

Uncertainty is drawn as texture rather than color, which survives both grayscale printing and the eight percent of the audience with a color vision deficiency.

We were asked for a visualization. What the agency actually needed was a way to be trusted in public.
Tomás Beckwith, studio director

Next in the index — 03

Halyard

A keyboard-first booking terminal that beat the phone call.